РусскийDeutschEspañolFrançaisItalia
white line white line

Project developed and fulfilled since 2006

Russia

Oil and gas

Project developed and fulfilled in Oil and Gas
  • Delivery of complex of processing equipment to ОАО Astrakhangazprom and ОАО Orenburggazprom.
  • Screw compressor plant delivery and engineering of the integrated propane pumping station for ООО Stavrolen Lukoil Neftekhim, Tomsk.
  • Delivery of high efficiency semi-submersible (barrel) LPG pumps to ООО Tobolsk-Neftekhim, Tobolsk.
  • Delivery of the automated gas analytic isobutane control system for ООО Tobolsk-Neftekhim, Tobolsk
  • Delivery of the main centrifugal pump units for MCB of catalytic cracking complex to ОАО Lukoil-Nizhnegorodnefteorgsintez, Kstovo, the Nizhny Novgorod region.
  • Two pump units for pumping С2-С6 base product were activated at ООО Tobolsk-Neftekhim, Tobolsk.
  • The project on modernization of ethylene furnaces with switching to running on hydrogen. Engineering and delivery of natural gas burners as well as hydrogen burners to ОАО Tomsky Neftekhimichesky Kombinat, Tomsk.
  • Project developed and fulfilled in Oil and Gas
  • Engineering and delivery of high pressure steam superheater to ООО Sibmetakhim, Tomsk.
  • Engineering and delivery of LPG pumping station during repair works on gas line, Nizhnevartovsk.
  • Delivery of valves, spare parts, tools and accessories for field facilities construction at ОАО "Tomskgazprom, Tomsk.
  • Delivery of valves and spare parts to ООО Gazprom Transgaz Ukhta, Ukhta.
  • Delivery of valves to ООО Gazprom dobycha Urengoi, Novy Urengoi.
  • Delivery of equipment to Gas Compressor Service for scheduled preventive maintenances and overhauls of the turbine compressor equipment and valves at ООО Tomskneft-Service, Tomsk
  • Project developed and fulfilled in Oil and Gas
  • Delivery of pump equipment, spare parts, tube bundles for heat exchangers to ОАО Strezhevskoy oil-refinery, Strezhevoy.
  • Delivery of shut-off and control valves to ООО Nizhnevartovsky GPK and ООО Belozerny GPK, Nizhnevartovsk.
  • Delivery of equipment assembly for pipeline hot tapping to PF Zapsibtransgaz, a branch of ОАО Siburtyumengaz, Nizhnevartovsk.
  • Delivery of valves to the new constructed field at ОАО Siburtyumengaz, Nizhnevartovsk.
  • Delivery of pump equipment and valves for the oil absorption plant at ООО Yugragazpererabotka, Nizhnevartovsk.
  • Delivery of valves to ОАО Gubkinsky GPP, Gubkinsky.
  • Delivery of valves to ОАО Noyabrsky GPP, Noyabrsk.
  • Project developed and fulfilled in Oil and Gas
  • Engineering of the sewage purification plant system for industrial effluents at ООО Lukoil Ukhta Refinery, Ukhta.
  • Engineering, delivery and supervising installation of two propane-butylene fraction injection pump units for reservoir pressure maintenance 329 bar 57m3/h for ZAO Vankorneft, Krasnoyarsk.
  • Delivery of Sundyne pump units for oil fuel and diesel oil pumping to ZAO Vankorneft, Krasnoyarsk.
  • Delivery and start up of the hydrogen compressor unit for reformer modernization at NGDU Elkhovneft-TatNeft, Elkhov.
  • Modernization of the air compressor station at NGDU Elkhovneft-TatNeft, Elkhov.
  • Engineering and delivery of multistage air blower as part of compressor plant modernization at ООО Lukoil Ukhta Refinery, Ukhta.
  • Packaged supply of pumps for isomerization units and replacement of electric heaters of gas furnaces for oil deep conversion complex at ООО Lukoil-Perm-Neftesintez, Perm
  • Packaged supply of pump units for oil deep conversion unit at ООО Kinef, Kirishi.
  • The reconstruction of hydro heater of a reformer at ООО Lukoil Ukhta Refinery, Ukhta.
  • Delivery of pump units for Visbcracking units and isomerization block to ООО Lukoil UNP, Ukhta
  • Delivery of the main charging pumps for the gas-processing plant at ОАО TAIF-NK, Nizhnekamsk.
  • Detailed engineering and packaged supply of the oil-desalting plants (electric dehydrators) for desalter modernization at Khabarovsk oil refinery, Allianz group, Khabarovsk.
  • Packaged supply of the pump units for bituminic system and chemical plant for production modernization at Khabarovsk oil refinery, Allianz group, Khabarovsk.

Chemistry

Project developed and fulfilled in Oil and Gas
  • Engineering of solid sulphur melting unit for Orenburggazprom, Orenburg.
  • Delivery and start up of ATUMAT high-pressure unit, WOMA type 700Z with diesel engine (pressure up to 2500 bar) at ZAO Kaustik, Sterlitamak.
  • Replacement of flameless burner units of furnaces at monomer production ОАО Tomskneftekhim, Tomsk.
  • Delivery of low NOx burner units for furnaces to ОАО Plastic, Uzlovaya.
  • Engineering of nitric fluoric etching titanium solution treatment unit for OAO VSMPO-AVISMA, Verkhnaya Salda
  • Engineering and modernization of pyrolysis furnace at ОАО Siburkhimprom.
  • Packaged supply of methanol production basic and auxiliary equipment within Methanol Casale production modernization project for ОАО Metafraks, Gubakha.
  • Project developed and fulfilled in Oil and Gas
  • Delivery of shell and tube heat exchanger–feed water heater (pressure 92/175 kg/sm2, temperature 320°С, weight 105 ton) for methanol unit modernization at ОАО Metafraks, Gubakha.
  • Packaged supply of pump units for Bisphenol-A plant at Kazanorgsintez, Kazan
  • Replacement of hot-resistant pyrolysis furnace insulation at АО TomskMetanol, Tomsk.
  • Packaged supply of thermal equipment for VGO reactors within АВВ Lummus project to TNK VR-RNPK, Ryazan.
  • Project developed and fulfilled in Oil and Gas
  • Engineering and delivery of the liquid waste incinerator in sulphuric acid production equipped with a burning unit and a valve station to TNK VR-RNPK, Ryazan.
  • Long-term monthly supply of flowing additives (Lilamin) and spray equipment for different kinds of granular fertilizer to ОАО AKRON, V. Novgorod, ОАО DOROGOBUZH, ОАО Nevinnomyssky AZOT, Nevinnomyssk, ОАО AZOT, Novomoskovsk, ОАО Kirovochepetsky Khimkombinat, Kirovochepetsk.
  • Delivery of pumping equipment for phosphoric acid production to Phosagro, Balakovo
  • Delivery of production ammonia barrel pumps for the enlargement of the ammonia shipping department at ОАО Minudobreniya, Rossosh.
  • Delivery of crushers for subquality products processing system to ОАО Minudobreniya, Rossosh.
  • Modernization and replacement of the drive steam turbine within TEC project at ОАО Minudobreniya, Rossosh.

Uzbekistan

Project developed and fulfilled in Oil and Gas
  • Modernization of the urea production plant; installation, start up and commissioning, replacement of numerous pumps of the piston machines with Sundyne high-speed single stage pumps, control and regulating system change in Urea Workshop at ОАО Maksam Chirchik, Chirchik.
  • Delivery and repair of the reformer with complete replacement of the reformer pipes and lining at ОАО Maksam Chirchik, Chirchik.
  • Engineering and replacement of the vertical heat exchanger (item 603) with horizontal heat exchangers in ammonia production at ОАО Maksam Chirchik, Chirchik.
  • Repair of the secondary reformer lining, modernization of the ammonia production pump station at ОАО Ferganaazot, Fergana.
  • Service maintenance, installation, commissioning of the pump and compressor station at Unitary Subsidiary Enterprise Bukhara Refinery, Bukhara.
  • Engineering and realization of the modernization project of the walking-beam reheating furnace №2 of the roll mill 300 Workshop 2 to reduce gas flow rate by 40% and increase design capacity and reduce scale at APO Uzmetkombinat, Bekabad.
  • Delivery and stepwise replacement of the chlorate cells in defoliant production at ОАО Ferganaazot, Fergana.
  • Development of the modernization and automatization project of the heat recovery boiler 2 at APO Uzmetkombinat, Bekabad.

Kazakhstan

Project developed and fulfilled in Oil and Gas
  • Engineering of the complex systems for oil sludge removal and processing in sludge pits during tank and water surface treatment for PetroKazakhstan Oil Products, Chimkent.
  • Delivery of the pumping equipment to Atyrau Refinery, Atyrau.
  • Delivery and complete equipping of modern complex quality evaluation laboratory for raw and finished products at Atyrau Refinery, Atyrau.
  • Turn-key delivery of the containerized injection pumps for pressure maintenance to АО Kaspiy Neft, Atyrau.
  • Turn-key delivery of the containerized injection pumps for pressure maintenance to TOO SP Matin, Atyrau.
  • Engineering, delivery and start up of the rotary calciners for uranium peroxide (UO4.2H2O) drying and calcining (300 kg/hr, humidity 30%) at the uranium mine Yuzhny Inkay, TOO SP Betpak Dala.
  • Turn-key delivery of the containerized injection pumps for pressure maintenance to TOO SP KazGerMunay, Kyzylorda.

Ukraine, Belarus and baltic states

  • Slime facilities modernization: delivery of the wedge-gate and knife gate valves, DN1000, with hydraulic drives and accumulators to Poltava GOK, Komsomolsk.
  • Delivery and maintenance of EDM machines for high-precision parts of gas turbines at ОАО Zorya-Mashproject, Nikolaev.
  • Engineering and replacement of the calciner lining at Nikolaev Aluminous Plant, Nikolaev.
  • Engineering and replacement of the reformer lining at ОАО Naftan, Novopolotsk.
  • Deliveries and supervised installation of the upgraded seals for floating roofs for oil storage tanks at Ukrtatnafta, Kremenchug.
  • Modernization and replacement of the drive steam turbine station for ammonia production within TEC project at ОАО Grodno Azot, Grodno.
  • Participating in reconstruction project and expansion of production by delivery of pumps for very aggressive media to OAO Azot, Cherkassy.
  • Modernization and replacement of automatic recirculation valves at ОАО Azot, Cherkassy.
  • Replacement of the catalysts for ammonia production at Odessa Port Plant, Yuzhnoye.
  • Delivery of the inert ceramic balls (nozzles) for chemical equipments to ОАО Naftan, Novopolotsk.
  • Engineering of the diesel fuel coloring unit for Vent-bunker, Latvia.
  • Engineering of the used oil cracking unit for ОАВ NAPC, Jonava, Lithuania.

Web-site bug report ENCE GmbH, Switzerland / ENCE gmbH, Schweiz / ЭНЦЕ ГмбХ, Швейцария © ENCE GmbH